NEMA Hybrid Stepper Motors
2-phase NEMA 17, 23, 24, 34 and 42 stepper motors for CNC, 3D printers and automation, bought direct from Chinese makers.
Options and prices
| Ref. | NEMA size / length | USD range per piece | Minimum order |
|---|---|---|---|
| LY1209-1 | NEMA 17 40 mm | 5.80 - 8.80 | 500 piece |
| LY1209-2 | NEMA 23 56 mm | 8 - 12 | 200 piece |
| LY1209-3 | NEMA 23 76 mm | 9 - 13 | 200 piece |
| LY1209-4 | NEMA 24 60 mm | 12 - 24 | 100 piece |
| LY1209-5 | NEMA 34 86 mm | 33 - 53 | 50 piece |
| LY1209-6 | NEMA 23 CL 57 mm | 45 - 75 | 50 piece |
| LY1209-7 | NEMA 42 11.2 Nm | 55 - 75 | 20 piece |
FOB Shenzhen / Changzhou / Ningbo, per motor. Indicative market ranges in USD, not offers. A written offer or proforma fixes price, specification and terms. Indicative prices, updated November 2026.
Two-phase hybrid stepper motors with 1.8 degree step angle for positioning in 3D printers, CNC routers, medical and textile machines. We buy from Chinese motor factories and quote per motor, FOB. Price follows frame size (NEMA 17 to 42), body length, holding torque and closed-loop encoder option. Buyers are machine builders, 3D printer and CNC kit assemblers, automation distributors and e-commerce sellers. Goods ship by sea in cartons after a torque test.
Specifications
| Step angle | 1.8 degree (0.9 degree optional), 2-phase |
|---|---|
| Flange | NEMA 17 = 42 mm, 23 = 57 mm, 24 = 60 mm, 34 = 86 mm, 42 = 110 mm |
| Holding torque | 0.2-0.5 Nm (NEMA 17) up to 12-24 Nm (NEMA 34/42) |
| Option size in mm | Body length for NEMA 17/23, size per listing for NEMA 24/34 |
| Closed loop | Encoder fitted, driver sold separately or integrated |
| Insulation | Class B, 80 K rise, 500 VAC 1 min |
| Packing | Single motors in foam trays or inner boxes, 50-100 per master carton, about 30,000 NEMA 17 or 8,000 NEMA 23 per 40' HC. |
| Typical origins | China, Taiwan, Japan |
Trade terms
- Price basis: FOB Shenzhen / Changzhou / Ningbo, per motor
- Payment: Telegraphic transfer (T/T), Letter of credit (L/C)
- Minimum order: 500 piece
- Lead time: 10-25 days