UPS Systems, Online Double-Conversion
Online double-conversion UPS from 1 to 10 kVA, tower and rack, for hospitals, data rooms and labs, bought direct from makers.
Options and prices
| Ref. | Rating | USD range per piece | Minimum order |
|---|---|---|---|
| LY1422-1 | 1 kVA | 130 - 210 | 20 piece |
| LY1422-2 | 2 kVA | 200 - 320 | 20 piece |
| LY1422-3 | 3 kVA | 280 - 450 | 20 piece |
| LY1422-4 | 6 kVA | 420 - 750 | 10 piece |
| LY1422-5 | 10 kVA | 800 - 1,350 | 5 piece |
FOB Shenzhen / Shanghai, per unit. Indicative market ranges in USD, not offers. A written offer or proforma fixes price, specification and terms. Indicative prices, updated November 2026.
Online double-conversion UPS units from 1 to 10 kVA, tower or rack-mount, with pure sine wave output, PF 0.9 to 1.0 and RS232 or SNMP monitoring. Buyers are hospitals, data rooms, laboratories, telecom integrators and electrical distributors. Price follows kVA, power factor, battery inclusion (1 to 3 kVA with internal batteries, 6 and 10 kVA usually without, long-backup type), and brand of IGBT and DSP controller. Shipped by the pallet or container with CE paperwork.
Specifications
| Topology | Online double conversion, pure sine wave |
|---|---|
| Power factor | 0.9 to 1.0 |
| Batteries | 1-3 kVA internal 12 V VRLA; 6-10 kVA external, not included |
| Communication | RS232, USB, SNMP card optional |
| Input / output | 220-240 V single phase, 50/60 Hz |
| Packing | One unit per carton on pallets; 1 to 3 kVA units with batteries weigh 15 to 35 kg, about 600 to 900 per 40' HC. |
| Typical origins | China, Taiwan, Türkiye, India |
Trade terms
- Price basis: FOB Shenzhen / Shanghai, per unit
- Payment: Telegraphic transfer (T/T), Letter of credit (L/C)
- Minimum order: 20 piece
- Lead time: 20-35 days